Station: CURRENTS

Site:

Depth: 28m

Mooring Diagram

AIMS

Location IMOS Lizard Island Shelf Mooring. Deployed 04/06/2008. Recovered 04/12/2008. Using new steel frame design - 20m wire to snag buoy.
GPS 14° 42.142' S, 145° 39.019' E
Deployment Type Steel Frame
Instrument RDIADCP-5759
Description RDI, ADCP - WORKHORSE SENTINEL, serial no. 5759
Capability 600kHz - BT + P + W + HiRes Firmware - 16.21
Sample Type currents, pressure
Sampling 30 x 1.0m Bins 10min/30min Bursts 200 pings/ens 0.5m Blanking Distance 20.7 Mb in 200 Days => 400Wh
Sample Depth 0.5 (m from bottom)
Time : Switch On 14/06/2008 at 03:25:00 UTC/GMT
Time : First Wet 14/06/2008 at 05:25:00 UTC/GMT
Time : First Good 14/06/2008 at 06:00:00 UTC/GMT
Time : Last Good 04/12/2008 at 00:15:00 UTC/GMT
Time : On Deck 04/12/2008 at 00:19:00 UTC/GMT
Time : Switch Off 04/12/2008 at 00:52:00 UTC/GMT
Comment RDI: 02:28:35 <=> GPS: 01:22:00 6216671 Bytes Note: Time drift => Need to process data for extra ensemble as per RDI procedure Data looks okay but stops at 0934:59 03/12/08 - Battery down to 36V but still pinging okay.
Filename DATA/TRIP004814/COR01000.000
Other Files Setup: COR01.WHP