Station: CURRENTS

Site:

Depth: 31m

Mooring Diagram

AIMS

Location IMOS Lizard Island Shelf Mooring. Deployed 23/04/2011
GPS 14° 42.112' S, 145° 38.479' E
Deployment Type Bottom Frame Inline Mooring
Instrument RDIADCP-13601
Description RDI, ADCP - WORKHORSE SENTINEL, serial no. 13601
Capability 600kHz 100m Pressure High resolution mode 1GB Memory
Sample Type currents
Sampling Depth Range: 35m Duration:200days Ensemble Interval: 10 mins Ping Interval: 2 mins Pings/Ensemble: 60 Bins: 34 Bin Size: 1m Blanking Distance: 0.88m Standard Dev: 0.90 Data Storage Required: 22.91MB Power Usage: 90% Battery Setup File: LSH16
Sample Depth 1 (m from bottom)
Time : Switch On 23/04/2011 at 00:59:00 UTC/GMT
Time : First Wet 23/04/2011 at 04:11:00 UTC/GMT
Time : First Good 23/04/2011 at 04:21:00 UTC/GMT
Time : Last Good 30/11/2011 at 00:00:00 UTC/GMT
Time : On Deck 30/11/2011 at 01:05:00 UTC/GMT
Comment Need to use external batteries to set up for wave sampling. Note new setup file name convention - GBROOS trip number Recover - evidence of drags marks on head of RDI. Dead battery - 3.8V. Has produced 1000 files largest file 75060 Bytes - last ensemble 23/04/2011 154900. When back removed from instrument there was an audible gas sound.
Filename DATA/TRIP005516/LSH16000.000