Station: CURRENTS/WAVES

Site:

Depth: 31m

Mooring Diagram

AIMS

Location IMOS Lizard Island Shelf Mooring. Deployed 26/10/2011
GPS 14° 42.107' S, 145° 38.499' E
Deployment Type Bottom Frame Inline Mooring
Instrument RDIADCP-14852
Description RDI, ADCP - WORKHORSE SENTINEL, serial no. 14852
Capability 600kHz, Hi Res BT, Waves, Hi Res Water modes inc WRII 100m Pressure Sensor 1 Gb Memory
Sample Type Current, waves, pressure
Sampling Max Range: 38.47m Duration: 220 days Ensemble Interval: 10min Ping Interval: 2s Pings/Ensemble: 60 34 x im bins Blanking: 0.88m Standard Dev: 0.9 WAVES Burst Duration:20min Time Betwen Bursts: 180min Collect Motion Data: No Samples/wave burst: 2400 Strorage Rquired: 339.54 Mb Power Required 3.0 Battery Packs Batt Voltage 44.54V, 44.73V Setup File: LSH18
Sample Depth 1 (m from bottom)
Time : Switch On 22/10/2011 at 03:59:00 UTC/GMT
Time : First Wet 25/10/2011 at 23:40:00 UTC/GMT
Time : First Good 25/10/2011 at 23:45:00 UTC/GMT
Time : Last Good 18/05/2012 at 22:07:00 UTC/GMT
Time : On Deck 18/05/2012 at 22:30:00 UTC/GMT
Time : Switch Off 19/05/2012 at 04:16:00 UTC/GMT
Comment 338.7 MB Power pin corroded on bulkheads at battery and ADCP ends of cable. No evidence of water ingress. Internal battery 23.65V. External battery 39.32V, 39.31V
Filename DATA/TRIP005438/LSH18000.000