| Location |
IMOS One Tree East Mooring. Deployed 23/03/2012 |
| GPS |
23° 29.006' S, 152° 10.355' E |
| Deployment Type |
Mooring |
| Instrument |
RDIADCP-13810 |
| Description |
RDI, ADCP - WORKHORSE SENTINEL, serial no. 13810 |
| Capability |
600kHz
100m Pressure
High resolution mode
1GB Memory
|
| Sample Type |
currents |
| Sampling |
Max Range: 64.23M
Duration: 200 days
Ensemble Interval: 10 min
Ping Inerval: 2 s
Pings/Ensemble: 60
30 X 2m Bins
Blanking Distance:0.88m
Standard Dev: 0.97cm/s
Setup File:
Storage Required: 20.71
Power: 441.62Wh
|
| Sample Depth |
8 (m from bottom) |
| Time : Switch On |
23/03/2012 at 01:59:00 UTC/GMT |
| Time : First Wet |
23/03/2012 at 06:30:00 UTC/GMT |
| Time : First Good |
23/03/2012 at 07:07:00 UTC/GMT |