| Location |
Darwin National Reference Station - Deployed 02/01/2011. Frame Location. This site comprises a bottom frame and WQM attached
to a Channel Marker #5
|
| GPS |
12° 20.285' S, 130° 41.789' E |
| Deployment Type |
Bottom Frame |
| Instrument |
RDIADCP-13880 |
| Description |
RDI, ADCP - WORKHORSE SENTINEL NEMO, serial no. 13880 |
| Capability |
600kHz
50m Pressure
200m Housing
1GB Memory
Firmware v51.37
|
| Sample Type |
currents, waves, NEMO |
| Sampling |
Currents
40 x 0.75m cells
120 pings per ensemble
Sampling 2mins/10mins
Waves
2100 samples
Interval 120min
Battery duration 180 days
Batteries 3+1
Memory 370Mb
NEMO
9600aud
CP1
EB 327
ED 260
HP 2100
HS 4,5,8,15,16
HV 4,5,8,15,16
HT 50
TE 600
TP 2
WL 64
WN 40
WP 60
WS 75
REC ON
CP4
OF 3
OL 23
OS 10
OH 0
OW 1
OL 1
OQ ON
OR OFF
ON 0
LJ 0
|
| Sample Depth |
0.5 (m from bottom) |
| Time : Switch On |
01/01/2011 at 22:59:00 UTC/GMT |
| Time : First Wet |
02/01/2011 at 07:04:00 UTC/GMT |
| Time : First Good |
02/01/2011 at 07:10:00 UTC/GMT |
| Time : Last Good |
25/06/2011 at 06:00:00 UTC/GMT |
| Time : On Deck |
25/06/2011 at 06:33:00 UTC/GMT |
| Comment |
Need to change start bin/ stop bin/ step bin in CR1000 code. Disable multiple attempts at collecting data.
Recovery: Instrument not communicating.Card removed for download. Raw Data files RDI_000.000 to RDI_040.000.
|
| Filename |
DATA/TRIP005354/600_000.NMEA to 600_030.NMEA |